Successful Completion Of New Equipment Installation

15 October 2024

Recently, the new production equipment in G-High Carbon has been installed and the Safety Department has completed a comprehensive acceptance of the power system for the new equipment. During the acceptance process, the simulations of actual operation scenarios were conducted to do a functional test of the power system, ensuring that it could meet the production requirements safely. 


Latest Articles

24 November 2026

Pursuit Of Perfection

On the workbench, this commitment to details flows through every process and is embedded in the p...
23 November 2026

Dusk

On one side lies the quiet grey of steel workshops,on the other, orange sunset clouds stretch acr...
16 November 2026

The Production Site

Wisdom from the front line keeps the gears of industrial innovation turning quietly amid every ex...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
Invalid Input
Copyright © 2026 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.