Formulate The Activity Plan Of Safe Production

14 May 2024

Today the Equipment And Safety Department of G-High Carbon finished planning the safe production activities in May. There were a series of concrete measures for the hidden problems on the production site and the ways to enhance the employees’ safety awareness in the plan, which would help in achieving the stable and continuous operation of specialized carbon material production lines. 


Latest Articles

24 March 2026

Operational Maintenance With Timeliness

G-High Carbon strictly adheres to production timelines. The minor flaw in No. 5 overhead crane is...
23 March 2026

Microstructural Configuration Optimization: High-Altitude Heavy-Duty Equipment Begins Shipment

The High-altitude engineering equipment is being shipped in full assembly, with carbon raiser reg...
20 March 2026

Blue Bridge Reclines Amidst The Hills, G-HIGH Carbon Walks Beside

The blue bridge spans across the verdant hills, its steel sinews stretching to carve pathways thr...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2026 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.