Do Inspection Of Night Production

19 February 2024

At 22:37, the staff on post of G-High Carbon was doing the production inspection so as to ensure the smooth operation of the production lines and timely delivery of carbon materials.


Latest Articles

26 November 2024

Do Acceptance Inspection Of Production Line Upgrade

Today, the Equipment And Technology Team of G-High Carbon conducted an acceptance inspection of t...
25 November 2024

Make Activity Plan

Today, the manager of the Production Department made the safety activity plan for this month. The...
22 November 2024

Take Precautions To Ensure Safety

Recently, the manager of the Safety Department has conducted an investigation into the applicabil...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2024 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.