Highway Was Closed Because Of Heavy Snow In Liaoning While G-High Still Operate Normally

24 February 2012

A heavy snow falled in Liaoning Province in the afternoon of February 22. Employees of G-High had already done the preventing work in advance, and quickly cleared up the snow in the plant when the snow stoped in the morning of February 23.

G-High's producing work was not affected by the snow, but part of the delivery work was put off because of the closure of expressway.  


Latest Articles

24 June 2026

Refining Practical Operations

The carbon raiser production line equipment runs smoothly. Based on real-site working conditions,...
23 June 2026

Field Visit, Synthesize Thoughts for Continuous Advancement

G-High Carbon's frontline team recently visited BMW in Shenyang for in-depth exchanges and explor...
22 June 2026

On-site Inspection, Optimized Control

Today, G-High Carbon’s management team reviewed the actual conditions of the carbon raiser produc...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2026 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.