G-High Held The Meeting After Spring Festival

12 February 2011

G-High held a meeting after the Spring Festival on Feb 7th, and the participants were mainly the person who are responsible for each department.

At the meeting, the manager confirmed their performance during the holiday, and required all the departments to quickly participate in the intense work after the holiday to prepare for the upcoming peak of shippment.


Latest Articles

24 March 2026

Operational Maintenance With Timeliness

G-High Carbon strictly adheres to production timelines. The minor flaw in No. 5 overhead crane is...
23 March 2026

Microstructural Configuration Optimization: High-Altitude Heavy-Duty Equipment Begins Shipment

The High-altitude engineering equipment is being shipped in full assembly, with carbon raiser reg...
20 March 2026

Blue Bridge Reclines Amidst The Hills, G-HIGH Carbon Walks Beside

The blue bridge spans across the verdant hills, its steel sinews stretching to carve pathways thr...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2026 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.