G-High Clean The Snow In Time To Ensure The Production

08 December 2010

The first heavy snow came upon Panjin City on November 28th. By knowing that the snow is coming, the producing department of G-High immediately covered the goods in advance. And the staff of G-High started to clean the snow when it was still snowing in the noon to ensure the production.


Latest Articles

11 February 2026

Inspection

Inside the production workshop of G-High Carbon raiser, the client moved slowly along the product...
05 February 2026

Precision-Controlled Carbon Raiser Production

In the central control operation area of G-High Carbon, technicians focus intently on the array o...
04 February 2026

Long As The Road Is, It Is Bound To Be Bright And Splendid

On a client visit, the G-High Carbon team was greeted by a splendid sunset on the horizon, with f...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2026 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.