The Way Of Delivery Is Blocked By The Road Construction

28 September 2010

The road between Shaling Village and Yulou Town is blocked because of the expansion of the provincial highway. And this segment of the highway is the only way that transport the raw materials and the finished goods. It influenced the delivery work of G-High seriously, and the leader of G-High has already tried to solve this problem.


Latest Articles

15 July 2025

Summer Blossoms At G-High Carbon

Beneath the summer breeze, himalayan meadow flowers at G-High Carbon plant have bloomed into a sp...
14 July 2025

Guardian Of Production Line Details

In the carbon raiser production workshop, figures wearing white helmets initiate dynamic inspecti...
11 July 2025

Collaborative Silhouette Before The Containers

Against the backdrop of the blue sky, G-High Carbon staff stand beside the shipping containers, a...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2025 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.