The Way Of Delivery Is Blocked By The Road Construction

28 September 2010

The road between Shaling Village and Yulou Town is blocked because of the expansion of the provincial highway. And this segment of the highway is the only way that transport the raw materials and the finished goods. It influenced the delivery work of G-High seriously, and the leader of G-High has already tried to solve this problem.


Latest Articles

12 December 2025

G-High Carbon Raiser: The "Metallurgical Key" To High-Speed Railway Infrastructure

Captured by G-High Carbon employees during a business trip, this moment at a high-speed railway s...
11 December 2025

Doing Investigation For Capacity Building

Recently, the Equipment and Safety Department from G-High Carbon conducted a field study on equip...
10 December 2025

A Rigorous Moment Before The Journey

As the morning mist began to disperse and the first light of dawn spread across the land, a truck...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2025 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.