The Way Of Delivery Is Blocked By The Road Construction

28 September 2010

The road between Shaling Village and Yulou Town is blocked because of the expansion of the provincial highway. And this segment of the highway is the only way that transport the raw materials and the finished goods. It influenced the delivery work of G-High seriously, and the leader of G-High has already tried to solve this problem.


Latest Articles

16 July 2026

Green Pitches Unveil The Grand Event, Steel Frameworks Mirror A Glorious Chapter

When the summer breeze of 2026 sweeps from the Rocky Mountains to the Gulf of Mexico, and when th...
15 July 2026

Mountains And Rivers Stretch long, We Go On Without Cease

On their business journeys, the staff of G-High Carbon pass through tranquil peaks and gently flo...
14 July 2026

Refining Specimens, Controlling The Source

At the start of each workday, the inspectors entered the designated testing area in accordance wi...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2026 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.