The Way Of Delivery Is Blocked By The Road Construction

28 September 2010

The road between Shaling Village and Yulou Town is blocked because of the expansion of the provincial highway. And this segment of the highway is the only way that transport the raw materials and the finished goods. It influenced the delivery work of G-High seriously, and the leader of G-High has already tried to solve this problem.


Latest Articles

21 October 2026

Production Site

Inside the G-High Carbon workshop, technicians in workwear stand side by side. One raises an arm ...
20 October 2026

A Flying Bridge Spans The River, Winds Unite Both Banks

On October 15th, the New China-DPRK Yalu River Bridge was officially opened to traffic. The river...
19 October 2026

This Is The Season When Foliage Glows In Amber And Gold

In G-High Carbon, torch trees stretch their branches and leaves in the autumn wind, where orange-...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2026 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.